 Those of you who have been to the Life Enrichment Center over the past few months may have noticed the caution tape and large trenches on your left as you drove in and wondered “What is going on?”

IMG_2195.jpgIMG_2203.jpg

Don’t worry, it wasn’t a major accident or small scale disaster. Those giant holes were a part of our continued effort to make improvements around the site.

Back when the campground was installed at the Life Enrichment Center, most RVs and trailers were smaller then they are today. As rigs got bigger,_MG_9459.jpeg 
so did their power needs and our 1970s campground was no longer able to provide many our guests and Workampers with the full amount of power their RVs needed. So, two years ago, with the help of donations from many of our Workampers, we began the process of upgrading some of our pull-through sites from 30 amp to 50 amp. And now, this year, we have continued that effort. Once the city signs off on all the work that has been done, we will have an entire row of sties that can provide 50 amp power to our guests.

           IMG_2201.jpg                  One of the new 50 amp pedestals 

 

In addition to upgrading the power in parts of the campground, work was also done to make some of our more secluded sites useable to more guests. IMG_2196.jpgOur staff spent many days clearing out these campsites behind the pavilion. At the same time, they ran sewer lines to some of those sites and upgraded the eletric to 50 amp so that trailers and smaller RVs, in addition to tent campers, can now enjoy these sites that are a little more out of the way and off the main road of the LEC.


And in the last big bit of news of Life Enrichment Center Campground upgrades, work will start shortly to begin the process of enclosing the Ivan Marx Pavilion in the campground. We received a sizeable donation from the LEC Workampers that will allow us to begin work on the pavilion at the end of this month!

IMG_2171.jpgIvan Marx Pavilion

Capture.jpg2015 LEC Workampers

As the years have passed and the needs of our guests have changed, we have realized that our screened pavilion, just like our lower amperage sites, no longer serves our guests in all the ways we’d like for it to. The pavilion serves many functions throughout the year: In IMG_2174.jpgsummer and fall months, it is used by our guests and campers as a meeting space, a dining area and more. In the winter months, it serves as a central hub for our Workampers, who use the space for morning devotions, social gatherings, movie nights, pot lucks, the occasional pickleball game and as a general daily hangout space. And in the spring time, the Florida Conference Women’s Retreats even use it as a workout space. It is our hope that this upgrade will allow us to serve all of these groups better and potentially find some new ways to meet our guest’s needs too.

The plan for enclosure is to begin by replacing the old screened windows with real windows and building in the walls to provide better insulation. This will let us to then condition the space, allowing for a more comfortable gathering place in both the summer and winter months.

IMG_2172.jpg

IMG_2173.jpg

Throughout all of these upgrades, it is our hope that we will be able to preserve the rich character and history that exists within the Ivan Marx Pavilion. The plan is for the beautiful wooden beams and ceiling to stay, giving the space both a slight rustic feel and a glimpse into its past. We want to honor what the space was, while still being able to modern parts of it so as to better serve our guests today.

IMG_2169.jpg

 

If you are interested in being apart of our efforts to upgrade our spaces so that we can continue to enrich lives in this natural setting, you can donate by clicking here.

more

Topics: retreat in Florida, workamping, upgrades

Continued Improvements at the Life Enrichment Center

Posted by Will Cooper

Oct 21, 2016 3:30:54 PM

The Life Enrichment Center is getting better all the time!
In a constant effort to better serve our guests, we have made some major strides in the last few months. 
 
IMG_2051.jpgIMG_2058.jpg
 
Thanks to a generous donation from Asbury UMC in Maitland, FL, we have undergone renovation of the Gold Room Kitchen. A favorite space for many groups throughout the year, the kitchen has long been in need of some care and attention.
 
IMG_20160801_095357964.jpgIMG_20160801_104116614.jpg
IMG_20160801_103858991.jpgIMG_20160801_095312137.jpg
The Gold Room Kitchen before the renovation began
 
We are ecstatic about the improvements. Along with a fresh coat of paint, it now has a brand new floor, LED lighting, and some updated appliances.
 
IMG_2054.jpg
IMG_2056.jpg
A look at some of the new updates in the Gold Room Kitchen
 
By the end of this year, the kitchen will improve even further with brand new counter tops and resurfaced cabinets. 

We are thankful for donors who so generously contribute to help grow this sacred space, and we are also glad to report that as the LEC grows ever healthier as an organization, we are able to tackle projects and make improvements out of our own budget.
 
IMG_1792.jpgIMG_1976.jpg
IMG_1974.jpgIMG_1795.jpg
LEC Staff members, Glenn and Tom, hard at work on the new floors
 
Earlier this year we were able to replace the ceiling in the Dining Hall as well as the Green and Blue rooms, and over the summer both the Green and Blue rooms saw their old, worn carpeting removed and replaced with brand new carpet tiles.
What a difference! 
 
IMG_1800.jpg
LEC staff member, Tom, putting the finishing touches on the new carpet in the Blue Room
 
IMG_2049.jpg
The Green Room, with updated ceiling and floor, ready for a group
 
Great things continue to happen here at the LEC, and we hope you will take a look around on your next visit to see these improvements.
Thank you for your continued support of this sacred space. 
 
more
DonateNow